♦♦♦♦♦ Introduction
As an indispensable material in construction projects, the quality of concrete is directly related to the safety and durability of the building structure. The mix proportion design of concrete is a key link to ensure the quality of concrete. During the construction process, how to ensure the mix ratio of concrete has become a problem that every construction worker must face and solve. This article will elaborate on how to ensure the mix ratio of concrete during the construction process from the aspects of concrete mix design, control measures during construction, and common problems and treatment methods.

♦♦♦♦♦ Concrete mix design
1. Clarify the project requirements. Before designing the concrete mix ratio, the project requirements for concrete must be clarified, including strength level, durability, impermeability, frost resistance, etc. These requirements will directly determine the various parameters of the concrete mix proportion. Select appropriate raw materials Concrete raw materials include cement, aggregates (sand, stone), admixtures (fly ash, slag powder, etc.) and admixtures.

2. Selecting appropriate raw materials is the basis for ensuring the concrete mix ratio. For example, the selection of cement should consider its strength grade, initial and final setting time and other factors; the selection of aggregate should consider its particle size distribution, mud content and other factors.
3. Carry out mix ratio design. According to the project requirements and raw material properties, parameters such as the water-cement ratio, aggregate dosage, admixture dosage, and admixture dosage of concrete are determined through experiments to obtain the concrete mix ratio. The mix design should follow the principles of economy, rationality, and feasibility, while meeting the project's requirements for concrete performance.
♦♦♦♦♦ Control measures during construction
1. Strictly control the quality of raw materials: During the construction process, the quality of raw materials should be regularly tested to ensure that they meet the design requirements. Unqualified raw materials should be replaced or disposed of in a timely manner. At the same time, the storage and preservation of raw materials should also be done well to prevent changes in the properties of raw materials due to improper storage.
2. Ensure accurate measurement: Various parameters of the concrete mix ratio need to be achieved through accurate measurement. Therefore, during the construction process, calibrated measuring equipment should be used to ensure accurate measurement of various raw materials. At the same time, metering equipment should be maintained and inspected regularly to ensure that it is in good working condition.
3. Strengthen mixing management: Mixing is a key link in concrete production and an important link in ensuring the concrete mix ratio. During the construction process, the management of the mixing station should be strengthened to ensure that mixing time, mixing speed and other parameters meet the design requirements. At the same time, the mixing equipment should be maintained and inspected regularly to ensure its normal operation.
4. Control the transportation and pouring process: During the concrete transportation and pouring process, effective measures should be taken to prevent concrete from segregating, bleeding and other phenomena. For example, during transportation, the vehicle speed should be appropriately slowed down and sharp turns should be reduced; during the pouring process, pouring points should be reasonably arranged and the pouring speed should be controlled. In addition, corresponding insulation or cooling measures should be taken according to weather conditions to ensure that the concrete maintains a suitable temperature during the pouring process.
♦♦♦♦♦ Frequently asked questions and solutions
1. Insufficient strength of concrete
Reasons: Improper mix design, unqualified raw material quality, uneven mixing, insufficient maintenance, etc.
Treatment method: Re-design the mix ratio, replace qualified raw materials, strengthen mixing management, ensure maintenance time, etc.
2. Concrete has poor workability
Reasons: improper water-cement ratio, large changes in aggregate moisture content, improper use of admixtures, etc.
Treatment methods: adjust water-cement ratio, control aggregate moisture content, select appropriate admixtures, etc.
3. Concrete segregation and bleeding
Reasons: Insufficient mixing time, too long transportation distance, too fast pouring speed, etc.

Treatment methods: increase mixing time, reduce transportation distance, control pouring speed, etc.
♦♦♦♦♦ Summary and Outlook
Ensuring the mix ratio of concrete is a key link in ensuring concrete quality. During the construction process, measures such as reasonable mix ratio design, strict raw material quality control, accurate measurement management, strengthening mixing management, and controlling the transportation and pouring process should be adopted to ensure that the concrete mix ratio is effectively guaranteed. At the same time, in response to common problems that may arise during the construction process, corresponding measures should be taken in a timely manner to ensure that the quality of the concrete meets the project requirements. With the continuous advancement of science and technology and the continuous emergence of new building materials, the mix design and construction control technology of concrete will continue to be updated and improved in the future.